Configure Construction

When you subscribe to and configure Construction, you enable construction-related workflows that allow you to do the following:

  • Configure and use project, task, and cost type dimensions to track construction projects using a full work breakdown structure.
  • Track project costs, change orders, estimates, and retainage at the project, task, and cost type levels.
Construction subscription is needed. To enable a Construction subscription, contact your Sage Intacct account manager. Regional support for Construction is limited to Australia, Canada, the United Kingdom, and the United States.
  1. To access subscriptions, go to Company > Admin > Subscriptions.

  2. Enable Construction.

  3. Select Configure.

    1. In the Job Management section, the Enable Job Management checkbox is selected by default, enabling the following capabilities:

      • Cost type dimension

      • Standard cost type catalog

      • Task-based product units

      • Project estimates in the Projects application

    2. In the Autofill GL Account and Item section, select the checkboxes as appropriate:

      • Prefill GL account and item from cost type in Accounts Payable (AP): Prefills GL accounts and items when you enter cost types in AP, and prefills GL accounts automatically for project estimates.

      • Prefill item from cost type (Purchasing): Prefills items in project estimates and Accounts Payable based on the selected cost type.

  4. Configure Projects for construction. Consider the following suggestions:

    • If you select to autofill GL accounts and items here, configure Projects dimensions to require GL accounts and items for cost types and for project estimates.

      For project estimates, you can enable the option to override the GL accounts and items on cost types.

    • If you plan to create a project hierarchy with parent projects and sub-projects, do not enable the Project ID sequence option.

    • If you duplicate projects infrequently with non-standard task IDs, enable the Task ID sequence option. This auto-numbers these tasks with a specific prefix indicating that they’re custom tasks.

      If you intend to duplicate projects and use standard tasks, do not enable the Task ID sequence option.
      Tasks that are duplicated on a project use custom Task IDs rather than standard Task IDs.
    • You must have an estimate ID.

      • To create estimate IDs automatically when importing estimates, enable the Estimate ID sequence option.

      • To enter custom estimate IDs manually, leave the Estimate ID sequence option blank.

    • If you plan to report on project profitability, define your project estimate options (such as GL budget ID and posting period).

    • Determine your billing options:

      • Base billing on hours or observed percent complete

      • Identify which applications supply billing transactions

      • Identify billing types and templates

    • If you plan to use the cost type dimension, you can require every cost type to have GL accounts and items.

      Some 3rd-party integrations can require GL accounts and items for cost types.